BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//SpacePolicyOnline.com - ECPv6.15.11//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:SpacePolicyOnline.com
X-ORIGINAL-URL:https://spacepolicyonline.com
X-WR-CALDESC:Events for SpacePolicyOnline.com
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20250309T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20251102T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20270314T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20271107T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20260420T080000
DTEND;TZID=America/New_York:20260420T230000
DTSTAMP:20260721T135341
CREATED:20260413T224114Z
LAST-MODIFIED:20260413T224114Z
UID:88280-1776672000-1776726000@spacepolicyonline.com
SUMMARY:NASA ROLL-OUT OF "TOP FOUR-FIFTHS" OF ARTEMIS III SLS ROCKET\, Apr 20\, 2026\, New Orleans\, LA
DESCRIPTION:NASA will roll out the largest part of the Space Launch System (SLS) rocket for the next Artemis mission\, Artemis III\, from the Michoud Assembly Facility in eastern New Orleans\, LA on April 20\, 2026.  More information is in NASA’s press release.  The time was not included. \nReferred to as the Top Four-Fifths or TFF of the rocket\, it will be loaded onto a barge for shipment to NASA’s Kennedy Space Center for launch in 2027.  The TFF includes the liquid hydrogen tank\, liquid oxygen tank\, intertank\, and forward skirt. \nThe engine section and boat-tail (which protects the engines during launch) of the SLS rocket already are at KSC and the four RS-25 engines themselves are scheduled to be shipped to KSC from Stennis Space Center\, MS no later than July 2026. \nAll the SLS segments are integrated — “stacked” — together in the Vehicle Assembly Building at KSC where the two Solid Rocket Boosters also are attached and the Orion capsule installed. \nArtemis III is now an earth-orbiting mission\, not a lunar landing mission as once planned\, to test rendezvous and docking techniques with the Human Landing Systems (HLSs) being built by SpaceX and Blue Origin to ferry astronauts between lunar orbit and the surface. As of April 2026\, neither HLS system is ready so the date for this mission is undetermined. The crew also has not yet been named. \nThe first lunar landing since Apollo\, Artemis IV\, is currently planned for 2028.
URL:https://spacepolicyonline.com/events/nasa-roll-out-of-top-four-fifths-of-artemis-iii-sls-rocket-apr-20-2026-new-orleans-la/
END:VEVENT
END:VCALENDAR