Category: Civil

Senate Bill Sets Stiff Requirements for Future NOAA Satellites – UPDATE

Senate Bill Sets Stiff Requirements for Future NOAA Satellites – UPDATE

UPDATE, May 20, 2015:   The Senate Commerce Committee approved the bill, as amended, today.  The amendments are posted on the committee’s website.  

ORIGINAL STORY, May 14, 2015:  A bill introduced today in the Senate by the chairman of the Senate Commerce, Science and Transportation Committee would set stiff requirements for future NOAA satellites as part of an effort to improve “seasonal” weather forecasts.  The bill, S. 1331, is scheduled for markup by the committee next week.

Committee chairman John Thune (R-SD) teamed with Sen. Brian Schatz (D-HI) to introduce the Seasonal Forecasting Improvement Act.  “Seasonal” is defined in the bill as longer than two weeks, but shorter than two years.  The main goal is to improve forecasts for unusually cold winters or hot summers, or drought, but the bill also includes provisions aimed at reforming NOAA’s procurement of satellites.

The intent of some of the satellite-related provisions is not clear and questions posed to the committee by SpacePolicyOnline.com were not answered as of the time of this writing. The following summary therefore relies simply on the language in the bill, which would require NOAA to —

  • improve procurement of polar and geostationary satellites and assess the operational viability of alternate observation platforms such as microsatellite constellations and ocean observing platforms;
  • use competitive procurement processes to acquire polar and geostationary satellites “in a program phase via a single procurement action” (“program phase” is defined as acquisition of a series of satellites sharing a common architecture, which sounds like a block buy);
  • assure that satellites are procured or acquired in a manner that “secures the best value” that takes into consideration integration with current ground systems, integration of spacecraft and instruments, capacity to respond to changes in requirements and credibility of risk management, and continuity and consistency of capability;
  • complete and operationalize the radio occultation “program of record in effect on the day before enactment of this Act” by deploying constellations of microsatellites in equatorial and polar orbits, integrating the resulting data into all national operational weather forecast models, and ensuring the resulting data are free and open to all;
  • develop all specifications for NOAA satellites based on “operational needs”; and
  • contract with the National Academy of Sciences by September 2018 — after its next Decadal Survey for Earth Science and Applications from Space is completed — for a 2-year study that includes recommendations on how to make NOAA’s satellite portfolio more robust and cost-effective (the bill lists a number of specific topics to be addressed).

In addition, NOAA is prohibited from procuring any future “program phase” of the Joint Polar Satellite System (JPSS) if the aggregate cost exceeds the aggregate cost “that was incurred … in procuring the Joint Polar Satellite System 1 and 2” as adjusted for inflation.  NOAA usually expresses the cost of the JPSS program, which includes the first two satellites, as $11.3 billion.  That cost includes about $4 billion from NOAA’s share of the since-cancelled DOD-NOAA-NASA National Polar-orbiting Environmental Satellite System (NPOESS).  Whether the bill’s sponsors intend to use $11.3 billion, as adjusted for inflation, as the ceiling for the cost of additional JPSS “program phases” or if they mean to exclude the NPOESS costs is one of the questions that remains to be answered.

The committee plans to markup this bill on May 20, along with several others, including one on Commercial Space Launch Competitiveness.

The House is scheduled to debate its Weather Forecasting Improvement Act, H.R. 1561, next week.  H.R. 1561 and S. 1331 seem to have similar intents, especially changing how NOAA procures satellites, but take different approaches.

Cause of Progress M-27M Failure Remains Elusive

Cause of Progress M-27M Failure Remains Elusive

Russian space experts continue to try to determine exactly what went wrong when Progress M-27M and its Soyuz 2.1a rocket separated on April 28.  Telemetry data reportedly are not enough to solve the mystery.

Russia’s official Tass news agency quotes an unnamed Russian space industry source as saying that “the telemetry data are not enough” and members of the State Commission investigating the incident are going to the companies that manufactured various components to inspect others from the same batches to try and recreate whatever went wrong.

Roscosmos and NASA indicated earlier this week that the investigation would finish by May 22, but Tass reported today that may slip.  “True, some findings may be presented by May 22,” it quotes the industry source, but “specialists will keep working at individual enterprises after that date.”

Progress M-27M was launched on April 28, but something went wrong when it separated from the third stage of its Soyuz launch vehicle that left both of them in incorrect orbits and the robotic cargo spacecraft spinning.   Control of the spacecraft was lost and it reentered over the Pacific Ocean on May 7 Eastern Standard Time (May 8 Moscow Time).  Initial speculation that the third stage exploded was ruled out in a preliminary report from the State Commission earlier this week. Roscosmos said on May 12  that determining the cause would require in depth computational and theoretical studies as well as modeling.

Russia, NASA and the other International Space Station (ISS) partners agreed on Tuesday to a revised schedule of crew and cargo flights to and from the ISS.  The return of Soyuz TMA-15M with three ISS crew members, planned for May 13, will wait until early June and the launch of their replacements was delayed from May 26 to July 24.   A different version of the Soyuz rocket is used for transporting crews to the ISS. 

The revised schedule calls for accelerating the next launch of a Progress cargo mission from August 6 to early July.   Progress M-27M was the second of four planned Progress launches to the ISS this year.  It was carrying three tons of food, fuel and other cargo.  NASA says that the loss of the spacecraft is not affecting U.S. operations on ISS, but Roscosmos has not indicated whether its crew activities are impacted.  

In addition to Russia’s Progress, ISS is resupplied by two U.S. commercial cargo vehicles — SpaceX’s Dragon and Orbital ATK’s Cygnus — and Japan’s HTV.  A Dragon is currently attached to ISS and three more launches are scheduled this year.  An HTV launch is planned for August and a Cygnus is expected by the end of the year.   NASA said on Tuesday, however, that the schedule of launches for the rest of the year remains under review.

NASA refers to Progress M-27M as Progress 59 because it is the 59th Progress to service the ISS, but many more Progress missions have been conducted since the first was launched in 1977.  Progress cargo ships supported the Soviet/Russian space stations Salyut 6, Salyut 7 and Mir before ISS.

House Appropriators Propose Big Increase for Europa, SLS, Cut to Commercial Crew-UPDATE

House Appropriators Propose Big Increase for Europa, SLS, Cut to Commercial Crew-UPDATE

UPDATE, MAY 14, 2015:  The subcommittee approved the draft bill today on a voice vote with no amendments.  The next step is full committee markup.  No date was announced.

ORIGINAL STORY, MAY 13, 2015: The House Appropriations Committee today released the draft FY2016 Commerce-Justice-Science (CJS) bill that will be marked up at subcommittee level on Thursday.  It recommends the same total budget level for NASA as the President requested, but allocates the funding differently.  Among the changes is a big increase for a robotic mission to Jupiter’s moon Europa, a favorite of subcommittee chairman Rep. John Culberson (R-TX) who has led successful efforts to add money for it in the past.  The Space Launch System (SLS) also gets a boost, including funds for an “enhanced” upper stage, while the commercial crew program is funded below the request.

The President is requesting $18.529 billion for NASA in FY2016 and that is the same as the subcommittee’s recommendation, so any additions or reductions recommended in the bill take place in a zero-sum context — if money is added for one activity, other activities suffer the consequences.

For example, the request includes only $30 million for a Europa mission. The bill allocates $140 million and specifies that it be launched by 2022 using NASA’s Space Launch System (SLS), which is still in development.  In addition to that funding in the Science portion of NASA’s budget, it specifies that $25 million of the $625 million recommended for Space Technology be spent on icy satellites surface technology and test beds.  Europa is one of those icy satellites (or “icy moons”) — a moon orbiting another planet in the solar system that is covered by ice.  NASA’s current plan for a Europa mission is for an orbiter, but advocates are pushing for a lander as well. 

NASA officials do not see a funding path that permits a Europa launch before the mid-2020s, but the subcommittee clearly has other ideas.  Where the money will come from elsewhere in NASA’s budget is not apparent in the bill.

The total amount recommended for Science in the draft bill is $5.237 billion, a $51 million cut compared to the $5.289 billion request.  Adding in the $110 million increase for Europa, that means other Science programs are absorbing a reduction of $161 million.  The House Science, Space and Technology (SS&T) Committee on April 30 approved, on a party-line vote, a 2016-2017 NASA authorization bill (H.R. 2039) that calls for deep cuts to NASA’s earth science program raising concerns that is where appropriators also plan to cut. 

SLS fares very well in the bill.  The Obama Administration proposed cuts to both the SLS rocket and the Orion spacecraft.  SLS and Orion are priorities for both Republicans and Democrats in Congress and the Administration’s decision to propose reductions heightens a long standing tension between the two ends of Pennsylvania Avenue.  The NASA authorization bill approved by House SS&T would restore both SLS and Orion to their current funding levels, but the draft appropriations bill favors SLS over Orion.  In the draft bill, Orion would get the same as the Administration proposed for this year ($1.096 billion instead of its current $1.194 billion), but SLS would get a hefty increase.  For  development, SLS would get $1.85 billion.  The request is $1.36 billion and its current funding is $1.7 billion.  The draft appropriations bill makes the SLS amount look even larger by combining the funds for development and ground systems ($410 million, the same as the request), plus a new category of “program integration” funds at $53 million for FY2016.  That yields a total of $2.313 billion, which would compare with $1.766 billion in the request if the same accounts are combined.

The $1.85 billion for SLS development includes $50 million for an “enhanced” upper stage.  Many of the payloads expected to be launched by SLS require a large upper stage — often called the “exploration upper stage” or EUS — but NASA does not have the funds to build it now.  Instead it is developing a less capable interim upper stage for early SLS flights, but advocates think it would be more cost effective to move directly to the EUS.  The subcommittee apparently agrees.

The commercial crew program, by contrast, would get $1.00 billion compared to the $1.24 billion request.  That is still a significant increase over the $805 million provided for FY2015, but NASA insists that anything less than the request could mean renegotiating the fixed price contracts with SpaceX and Boeing.

A SpacePolicyOnline.com fact sheet provides a breakdown of what is proposed in the draft appropriations bill compared with the request, and a separate table shows what the House SS&T committee recommended in its authorization bill.

 

House SS&T Approves Four Commercial Space Bills

House SS&T Approves Four Commercial Space Bills

The House Science, Space and Technology (SS&T) Committee approved four commercial space bills today after lengthy debate largely along partisan lines.  Thirteen amendments were offered to the main bill, the SPACE Act (H.R. 2262), an update of the Commercial Space Launch Act.  While Republicans touted a long list of endorsements from commercial space companies, Rep. Eddie Bernie Johnson (D-TX) did not find that surprising, protesting that “the bill came straight from industry.”

Sponsored by House Majority Leader Kevin McCarthy (R-CA), the Spurring Private Aerospace Competitiveness and Entrepreneurship (SPACE) Act is a broad bill with many provisions and it engendered lengthy debate.  House SS&T Chairman Lamar Smith (R-TX) and Space Subcommittee Chairman Steve Palazzo (R-MS) are original co-sponsors.   Perhaps the most significant amendment adopted to that bill was proposed by Rep. Steve Knight (R-CA) to extend until 2025 the “learning period” for commercial human spaceflight as well as the FAA’s authority to indemnify commercial space launch companies against certain amounts of third party liability in the event of a launch accident.

The learning period refers to a span of years when the FAA is not
allowed to promulgate new regulations governing commercial human
spaceflight that might stifle that industry’s growth as it gains
experience.  That period is set to expire on September 30, 2015.  The indemnification provision means that the government
would pay for certain amounts of damages to uninvolved individuals in
the event of a launch accident (the commercial companies must purchase
insurance to cover other amounts).  The government has had
Indemnification authority for commercial launches since 1988, but
Congress extends it for set periods of time rather than permanently so
it can periodically review whether it is still needed.  Current authority ends on December 31, 2016.

As introduced, H.R. 2262 would have extended the learning period and third-party indemnification to 2023.   Knight argued for another two years to provide stability for the commercial industry.  Rep. Donna Edwards (D-MD) offered amendments to reduce the time to 5 years for both provisions so Congress could have more opportunity to review the issues as the industry evolves.  She pointed out that the Senate version of the bill would extend those provisions only until 2020.  Nonetheless, Knight’s amendment won.

The Space Resource Exploration and Utilization Act, H.R. 1508, sponsored by Rep. Bill Posey (R-FL), also was particularly controversial.  It grants property rights to materials mined on asteroids by U.S. companies.  The bill is co-sponsored by a Democrat, Rep. Derek Kilmer (D-WA), but he is not a member of House SS&T and Democrats on this committee strongly opposed it.   Johnson offered a substitute that would have called for a study of the issues associated with property rights in space, noting that at a hearing last year, a highly respected space lawyer, Joanne Gabrynowicz, asserted a prior version of the bill would violate U.S. obligations under the 1967 Outer Space Treaty.   Johnson said that Gabrynowicz reviewed the current bill and had similar concerns.  Rep. Alan Grayson (D-FL) went further and said “the bill is unconstitutional, not even a close question.”  Posey countered that there have been enough studies and what is needed now is action to ensure U.S. leadership in this pursuit.  As for the constitutionality question, he repeated a point made by Grayson that the founding fathers could not have imagined a time when laws were needed about mining other bodies in the solar system, and said that raising this as an issue was simply an obstructionist tactic.  Johnson’s amendment failed on a party-line vote.

The other two bills were less controversial.   Rep. Bridenstine’s (R-OK) Commercial Remote Sensing Act (H.R. 2261) and Rep. Rohrabacher’s (R-CA) Office of Space Commerce Act (H.R. 2263) passed easily, with a relatively minor Grayson amendment adopted to H.R. 2261.  That bill seeks to facilitate NOAA granting licenses to commercial remote sensing companies in a timely manner.  H.R. 2263 would change the name of NOAA’s Office of Space Commercialization to the Office of Space Commerce and expand its responsibilities.

The texts of all the bills and amendments and the disposition of the amendments are posted on the committee’s website.

House Appropriators Praise FAA Space Office, But Will Deny Funding Increase-UPDATE

House Appropriators Praise FAA Space Office, But Will Deny Funding Increase-UPDATE

UPDATE, May 13, 2015:  The full committee approved the bill today with no changes to the FAA space office funding.

ORIGINAL STORY, May 12, 2015:  The full House Appropriations Committee will mark up the FY2016 Transportation-Housing and Urban Development (T-HUD) bill tomorrow (May 13).  It plans to hold the FAA’s Office of Commercial Space Transportation (AST) to its FY2015 funding level rather than approving a requested increase even though the draft report accompanying the bill praises the office and its intention to expand its efforts towards commercial lunar operations.

After expressing support for using NASA’s Space Launch System (SLS) for commercial launches, the draft report lauds AST’s “willingness to leverage its existing launch licensing authority to encourage private sector investment in lunar systems that will work in tandem with SLS and Orion” and asks for more details on specific “zones of exclusive operation on the lunar surface.” 

It also encourages the FAA to issue regulations for insurance requirements for State and local property.  Only Federal property is addressed in existing regulations, which became an issue when the State of Virginia failed to insure its property at the Mid-Atlantic Regional Spaceport (MARS) at NASA’s Wallops Flight Facility that was damaged by Orbital Sciences Corporation’s Antares failure in October 2014.

Despite asking AST to do this additional work, the committee proposes to deny a requested $1.5 million increase — from $16.605 million in FY2015 to $18.114 million in FY2016.  Instead, the office would be level-funded.  AST is part of the FAA’s operations budget and the total request is $9.915 billion.  The committee is set to approve $9.869 billion, a reduction of $45 million from the request, but $129 million more than FY2015. 

The draft report is based on the T-HUD subcommittee mark up of the bill on April 29.  Amendments could be offered at the full committee markup tomorrow or on the floor of the House when the bill is debated there.  The full committee markup is scheduled to begin at 10:15 am ET tomorrow.

Senate Commercial Space Launch Bill Includes Extending ISS to 2024-UPDATE

Senate Commercial Space Launch Bill Includes Extending ISS to 2024-UPDATE

UPDATE, May 13, 2015:  Senator Cruz issued a press statement today that includes expressions of support for the bill from a variety of commercial space industry companies and organizations.

ORIGINAL STORY, May 12, 2015: The sponsors of a bipartisan Senate bill to update the Commercial Space Launch Act (CSLA) issued a statement today saying the bill responds to the needs of a changing industry.  The bill brings the future of the International Space Station (ISS) into the commercial space launch debate.  The two are intertwined with the advent of the commercial cargo and commercial crew programs, but the bill language is more general, formally committing the United States to ISS operations through 2024 as proposed by the White House last year.  The bill is quite different from legislation that will be marked up by a House committee tomorrow.

S. 1297 is co-sponsored on the Republican side by Sen. Ted Cruz (R-TX) and fellow presidential hopeful Sen. Marco Rubio (R-FL) along with freshman Sen. Cory Gardner (R-CO).   Sen. Bill Nelson (D-FL) and freshman Sen. Gary Peters (D-MI) represent the Democrats.  Cruz chairs the Space, Science and Competitiveness subcommittee of the Senate Commerce, Science, and Transportation Committee.  Peters is the top Democrat (ranking member) on that panel.  Nelson is the ranking member of the full committee. Cruz, Rubio, Nelson and Gardner are from States with strong government and commercial space sectors.

Entitled the Commercial Space Launch Competitiveness Act, S. 1297 would extend the “learning period” for commercial human spaceflight, as well as the FAA’s authority to provide third-party indemnification to U.S. launch services providers, to 2020.  The learning period refers to a span of years when the FAA is not allowed to promulgate new regulations governing commercial human spaceflight that might stifle that industry’s growth as it gains experience.  The indemnification provision means that the government would pay for certain amounts of damages to uninvolved individuals in the event of a launch accident (the commercial companies must purchase insurance to cover other amounts).  The government has had Indemnification authority for commercial launches since 1988, but Congress extends it for set periods of time rather than permanently so it can periodically review whether it is still needed.

Those provisions are different from legislation that will be marked up by the House Science, Space and Technology Committee tomorrow.  That committee is set to debate four commercial space bills, one of which — the SPACE Act, sponsored by House Majority Leader Kevin McCarthy (R-CA) — is also intended to update CSLA.  The House and Senate bills are different in many ways.

The House bill would extend the learning period and third-party indemnification through 2025 rather than 2020.  It addresses a range of other issues including space traffic management and a sense of Congress statement that States should take proper measures to secure their investments in space launch facilities.

The Senate bill does not discuss either of those issues, but commits the United States to continued operation and utilization of ISS, which is not addressed in the House bill.  S. 1297 would enact into law a U.S. commitment to ISS operations through at least 2024, instead of at least 2020 as stated in the 2010 NASA Authorization Act.  The White House announced over a year ago that it plans to continue ISS operations through 2024, but that is not codified in law yet. 

The Senate bill also calls on the White House Office of Science and Technology Policy (OSTP) to determine what federal agenc(ies) should oversee various aspects of the commercial utilization of space, and for the FAA to streamline approval of licenses and permits for hybrid vehicles that currently must deal with two separate FAA offices.

S. 1297 also includes language requiring the Secretary of Transportation
in consultation with the Secretary of Defense and others to submit a
study on the feasibility of releasing “safety-related space situational
awareness [SSA] data and information.”  DOD’s willingness (or lack
thereof) to release certain SSA data on the locations of U.S. and other
satellites to commercial space operators is a long-running debate. 
While SSA is part of space traffic management, the provisions in the
House and Senate bills seem only tangentially related to each other.

There are similarities, though.  Both bills add and define “government astronaut” as a type of individual who might be aboard a commercial human space flight, encourage industry to develop voluntary standards for commercial human spaceflight, smooth the process for moving from experimental permit to a license, and encourage the FAA to update how it calculates “maximum probable loss” in determining how much insurance commercial launch services companies must purchase.

The House and Senate bills both are very broad and include many other provisions.

The Senate Commerce Committee has not announced a date to mark up S. 1297.  Cruz held a hearing on commercial space issues on February 25 and he has stated several times that updating CSLA is his first priority as subcommittee chairman. 

Editor’s Note: the original version of this article said the House bill extends third party indemnification and the learning period to 2023, but it is 2025.  As introduced, it was 2023, but it was amended during committee markup to 2025.

Space Station Crew Return Delayed Until June, Next Launch Until July

Space Station Crew Return Delayed Until June, Next Launch Until July

NASA and its partners in the International Space Station (ISS) program decided today to extend the mission of three ISS crew members who were supposed to return to Earth tomorrow and postpone the launch of their replacements. The schedule change was prompted by the failure of Russia’s robotic Progress M-27M spacecraft last week.

Progress M-27M reentered over the Pacific Ocean on May 7 Eastern Daylight Time (EDT) and Roscosmos proposed changes to ISS crew and cargo flights at that time.  NASA announced today agreement among all the partners to the revised schedule, though exact dates have not been determined.  The ISS is a partnership among the United States, Russia, Canada, Japan, and 11 European countries working through the European Space Agency (ESA).

NASA’s Terry Virts, ESA’s Samantha Cristoforetti and Roscosmos’ Anton Shkaplerov were scheduled to return to Earth on their Soyuz TMA-15 spacecraft tomorrow (May 13).  The exact date for their rescheduled return in early June will be determined later.  The launch of their replacements on Soyuz TMA-17M will be postponed from May 26 to late July.   The three other ISS crew members now aboard ISS are NASA’s Scott Kelly, and Roscosmos’ Mikhail Kornienko and Gennady Padalka.  Kelly and Kornienko are part of the first one-year mission aboard ISS and will not return until March 2016.  Padalka is currently scheduled to come home in September.

Progress M-27M was launched on April 28, 2015 EDT and immediately ran into trouble.  A malfunction at the time it separated from the third stage of its Soyuz 2.1a rocket left both in incorrect orbits and the Progress spacecraft spinning.  One theory is that the third stage exploded, debris punctured the spacecraft’s fuel line, and venting fuel put Progress into a spin.  Roscosmos said today that the State Commission investigating the accident will conclude its work by May 22.

Progress M-27M was the second of four planned Progress cargo missions to the ISS this year.  The next had been scheduled for August 6, but the new schedule will accelerate that by about a month.

The new plan is as follows:

  • Return of Soyuz TMA-15M (Virts, Cristoforetti, Shkaplerov) in early June instead of on May 13
  • Progress M-28M launch in early July instead of August 6
  • Launch of Soyuz TMA-17M with Kjell Lindgren (NASA), Kimiya Yui (Japan Aerospace Exploration Agency) and Oleg Kononenko (Roscosmos) in late July instead of on May 26

NASA refers to Progress M-27M as Progress 59 because it is the 59th Progress to resupply ISS, but the Progress spacecraft has been in use by Russia since 1977 so there have been many more flights than that.  It was carrying three tons of food, fuel and other supplies for the ISS crew, but NASA insists that U.S. operations are not affected by the failure.  

A U.S. SpaceX Dragon cargo craft is currently attached to the ISS, and three more are scheduled this year.  Japan’s HTV cargo spacecraft is scheduled for launch in August and the U.S. Orbital ATK Cygnus cargo spacecraft is expected to be launched by the end of the year.  NASA said, however, that all of the dates for the remaining flights to ISS this year are under review. 

Four House Commercial Space Bills Span Wide Range of Topics

Four House Commercial Space Bills Span Wide Range of Topics

The House Science, Space, and Technology Committee will mark up four bills on May 13, 2015 dealing with a broad range of commercial space activities.  Three of the bills have yet to be introduced, but SpacePolicyOnline.com obtained copies.  In total, they span everything from regulating commercial human spaceflight to third party indemnification to property rights for mining asteroids to expanding the role of NOAA’s Office of Space Commercialization.

The committee announced the markup and the titles of the bills late this afternoon.  Only one has a bill number because the others are yet to be introduced. The bills are:

  • H. R. ___, the Spurring Private Aerospace Competitiveness and Entrepreneurship Act of 2015 (the SPACE Act)
  • H.R. 1508, the Space Resource Exploration and Utilization Act of 2015
  • H.R. ____, the Commercial Remote Sensing Act of 2015 and
  • H.R. ____, the Office of Space Commerce Act

According to the copies obtained by SpacePolicyOnline.com, the four bills have the following goals:

  • The SPACE Act will be introduced by House Majority Leader Kevin McCarthy (R-CA), who represents a district including Edwards Air Force Base and the Mojave Air and Space Port, along with House SS&T chairman Rep, Lamar Smith (R-TX) and Space Subcommittee Chairman Rep. Steve Palazzo (R-MS). The broadly-based bill is aimed at updating the Commercial Space Launch Act (CSLA).  Among its provisions the bill would:
    • extend the so-called “learning period” during which the FAA is prohibited from issuing new regulations for commercial human spaceflight until 2023. That restriction currently expires on September 30 of this year.  It also allows industry to develop voluntary industry standards and requires a report from the Secretary of Transportation in 2021 on industry’s progress in that regard and an independent assessment of the readiness of industry and government to transition to a framework that “may include regulations.”
    • extend the government’s ability to indemnify commercial space launch companies from certain amounts of third party losses through 2023 (the current authority expires in December 2016).
    • require updating the methodology to establish the maximum probable loss used by the FAA to establish requirements for companies to obtain third party liability insurance.
    • add and define “government astronaut” as a type of personnel that may be aboard a commercial human spaceflight mission.
    • require a study by an independent contractor of frameworks for space traffic management.
    • make a “sense of Congress” statement that launch facilities developed, owned or operated by States should take proper measures to “secure their investments and the safety of third parties from potential damages….”   That language probably is in response to the damage caused by the failure of Orbital’s Antares rocket at the Mid-Atlantic Regional Spaceport (MARS) facility at NASA’s Wallops Flight Facility in October 2014.  The MARS facility is owned by the State of Virginia rather than the Federal Government and although Orbital had purchased required insurance under its FAA license (and other insurance for company purposes), Virginia did not buy insurance to cover its potential losses.  Virginia’s two Senators led efforts to add $20 million to the FY2015 appropriations bill that funds NASA to cover those losses, but the Obama Administration is reluctant to release those funds.
  • H.R. 1508 was introduced by Rep. Bill Posey (R-FL) and Rep. Derek Kilmer (D-WA) on March 19, 2015 and establishes a legal framework to govern property rights for U.S. companies involved the exploration and utilization of asteroids.  The committee held a hearing on similar legislation last year.
  • The Commercial Remote Sensing Act of 2015 will be sponsored by Rep. Jim Bridenstine (R-OK) to require annual reports from the Secretary of Commerce on its activities related to issuing licenses to commercial remote sensing companies, and a separate report on statutory changes that may be needed to protect national security, protect the U.S. industrial base, and reflect the current state of the art of remote sensing technologies.
  • The Office of Space Commerce Act will be sponsored by Rep. Dana Rohrabacher (R-CA) to rename the Department of Commerce’s Office of Space Commercialization as the Office of Space Commerce and amend its responsibilities, especially increasing its role in positioning, navigation and timing satellites (i.e. GPS).

The markup is at 2:00 pm ET on May 13, 2015.

 

Progress M-27M Reenters, Russians Propose Changes to ISS Schedule – UPDATE

Progress M-27M Reenters, Russians Propose Changes to ISS Schedule – UPDATE

UPDATE:  Adds information on JSpOC confirming the reentry.

The Progress M-27M spacecraft reentered over the Pacific Ocean at 05:04 Moscow Time on May 8 (10:04 pm Eastern Daylight Time tonight) according to Russia’s space agency, Roscosmos.  Roscosmos reportedy is proposing changes to the schedule for launching the next crews and cargo missions to the International Space Station (ISS) as they continue to diagnose and remedy what went wrong.

Roscosmos said in a statement that the robotic spacecraft, which was carrying about three tons of cargo intended to resupply the ISS crew, “ceased to exist … over the central Pacific Ocean” at 05:04 Moscow Time on May 8 (May 7, 10:04 pm EDT).  The U.S. Joint Space Operations Center (JSpOC) later issued a statement confirming the reentry.

Launched on April 28, the spacecraft apparently was damaged when the third stage of its Soyuz 2.1a rocket suffered a malfunction as the two reached orbit.  Anatoly Zak at RussianSpaceWeb.com reported yesterday that Russian experts believe the third stage exploded, damaging the spacecraft and puncturing its fuel lines, putting it into a spin as the fuel vented into space. Russian flight controllers initially received conflicting data about the spacecraft’s status, then received video from an onboard camera showing it rotating several times a minute.   Soon thereafter, the mission was declared a total loss.

A Roscosmos working group is proposing changes to the next launches of ISS personnel and cargo as efforts continue to determine what happened with the Soyuz 2.1a rocket.  This was the second of four planned Progress launches to ISS this year.  The next two are currently scheduled for August 6 and October 22.  Russia uses a different variant of the Soyuz rocket to launch three-person crews on Soyuz spacecraft.  Three more Soyuz crew launches are scheduled this year:  May 26, September 1, and November 20.

The proposal is to delay the next Soyuz crew launch, Soyuz TMA-17M carrying Oleg Kononenko from Roscosmos, Kimiya Yui from the Japan Aerospace Exploration Agency (JAXA), and Kjell Lindgren from NASA, until June 11 according to Russia’s official news agency, Tass.   Another Progress flight would be launched in late June/early July, and then another crew launch at the end of July, a separate Tass story stated.  These dates are all preliminary at this time.

Reentry Update for Progress M-27M – LATEST UPDATE

Reentry Update for Progress M-27M – LATEST UPDATE

UPDATE, May 7, 2015, 8:30 pm EDT:  Aerospace Corp’s latest prediction is May 8 02:41 UTC ±2 hrs. Subtract 4 for EDT.   Its groundtrack is:

Source: Aerospace Corporation

UPDATE, May 7, 2015, 7:45 pm EDT:  JSpOC’s newest prediction is 01:52 GMT May 8, which is 9:52 pm EDT tonight (May 7).

UPDATE, May 7, 2015, 2:05 pm EDT:   Roscosmos has issued a new update, estimating the reentry will occur between 01:13 and 04:51 Moscow Time on May 8.  That is today, May 7, between 6:13 pm and 9:51 pm EDT.  JSpOC’s latest estimate is 01:36 UTC on May 8 which is 9:36 pm EDT tonight.  Aerospace Corp’s latest is May 8, 01:08 UTC  ± 2 hours (subtract 4 for EDT) and it has posted a ground track showing the reentry path.

ORIGINAL STORY, May 7, 2015, 8:27 am EDT:  Russia’s space agency Roscosmos has refined its estimate of when the Progress M-27M spacecraft will reenter Earth’s atmosphere.  Its current estimate is on May 8 between 00:45 and 06:26 Moscow Time, which is May 7 (today) 5:45 pm – 11:26 pm Eastern Daylight Time (EDT).  It plans to issue an update later today.

Russia is not the only source of estimates of the reentry time. 

  • T.S. Kelso’s (@TSKelso) latest calculation is May 8 at 0859 UTC ± 24 hours, which is May 8 (Friday) at 4:59 am EDT.  However, since there is a 24 hour window, that could mean anytime between now (May 7) and Saturday (May 9) morning. 
  • The Aerospace Corporation’s current estimate is May 8 at 23:09 UTC ± 18 hours, which is May 8 at 7:09 pm EDT.  Adjust for the ± 18 hours and that provides a Friday-Saturday window of May 8 at 5:09 UTC – May 9 at 17:09 UTC, or  May 8 at 1:09 am EDT – May 9 at 3:09 pm EDT.
  • The U.S. Joint Space Operations Center (JSpOC) estimate posted on space-track.org is May 8 at 03:32 UTC, which is today, May 7, at 11:32 pm EDT, very close to the end of the window calculated by Roscosmos.

The fact that so many estimates exist illustrates the difficulty in calculating when any space object will reenter in an uncontrolled situation like this.   Many factors must be taken into account including solar activity and the size, shape and composition of the object.   The only factor known with certainty is the boundaries of the latitude on Earth where surviving debris could fall, which is set by the object’s orbital parameters.  In this case, Progress M-27M is in a 51.6 degree orbit, so debris could fall anywhere between 51.6 degrees North latitude and 51.6 degrees South latitude.  Since 70 percent of the world’s surface is water, and much of the land is sparsely populated, the chances of debris hitting a person or building is small, but does exist.

Progress M-27M was launched on a Soyuz- 2.1a rocket from the Baikonur Cosmodrome in Kazakhstan on April 28.  A malfunction in the rocket or spacecraft caused it to fail as it reached orbit.  The failure is still under investigation.  NASA refers to it as Progress 59 because it is the 59th Progress to resupply the International Space Station (ISS).   This is the second of four planned Progress resupply flights this year.  The schedule for the remaining two is uncertain until the cause of this failure is understood and rectified. 

ISS is also supplied by two U.S. spacecraft (SpaceX’s Dragon and Orbital ATK’s Cygnus) and Japan’s HTV.  A Dragon is currently attached to ISS and three more launches are planned this year.  An HTV launch is scheduled for August and a Cygnus is expected by the end of the year.  NASA says U.S. operations aboard the ISS will not be affected by the loss of this Progress.