Category: Commercial

Roscosmos Official Confirms Proton Sensors Upside Down, Flights May Resume in September

Roscosmos Official Confirms Proton Sensors Upside Down, Flights May Resume in September

Despite skepticism from a Russian Deputy Prime Minister, an official with Russia’s space agency, Roscosmos, confirms that the recent Proton-M launch failure was caused by sensors that were installed upside down.

Alexander Lopatin, a deputy director of Roscosmos, is quoted today by Russia’s official news agency, Itar-Tass, as confirming earlier reports that angular rate sensors were installed “head over heels.”  Deputy Prime Minister Dmitry Rogozin disputed the earlier reports saying that installation of the sensors was virtually foolproof.

Nonetheless, that is what happened according to Lopatin.  “The cause was an industrial process violation, the human factor,” he said.  The six angular rate sensors themselves were fine and passed all tests, but three of them were installed “head over heels” by workers at Khrunichev, the rocket’s manufacturer. 

The Proton-M rocket crashed spectacularly 17 seconds after launch on July 1 Eastern Daylight Time (July 2 local time at the launch site in Kazakhstan).  Three Russian GLONASS navigation satellites were destroyed.

Lopatin added that Proton rocket launches could resume in September.

House Appropriators Clear CJS Bill, Hope for Floor Action

House Appropriators Clear CJS Bill, Hope for Floor Action

The House Appropriations Committee approved the FY2014 Commerce-Justice-Science (CJS) bill, which includes NASA and NOAA, but what will happen to it next is unclear.

The committee is currently considering, and is expected to approve, the Financial Services bill.  As Chairman Hal Rogers (R-KY) pointed out, by the end of today six appropriations bills will be waiting in line for floor action.  He said he hopes House leadership will find time to bring them up for consideration as the days count down to the beginning of FY2014 on October 1.   Congress will be in recess for much of August.   The House is scheduled to be in session for only 19 more days prior to that deadline.

The defense appropriations bill may reach the floor this week, but the status of the others, including CJS, is up in the air. 

It has been many years since Congress completed action on the 12 regular appropriations bills on time; this year is not likely to be an exception.   Differences between the House and Senate are pronounced, with the House and Senate Budget Resolutions making very different assumptions about spending levels, so even if the House passed all its bills, reaching agreement between the two chambers will be a Herculean feat.  Sen. Bill Nelson (D-FL) predicted last month that no major budget-related decisions will be made until Congress is forced to act to raise the debt limit, which will not be under the end of the calendar year.

NASA is a good example of the differences.  The House committee approved $16.6 billion for the agency, $1.1 billion less than the $17.7 billion request.   The Senate Appropriations CJS subcommittee approved $18 billion, about $300 million more than the request when it marked up its version of the bill yesterday.  The full Senate committee is scheduled to mark up the bill tomorrow morning.

 

 

Senate Appropriations Subcommittee Approves $18 Billion for NASA in FY2014

Senate Appropriations Subcommittee Approves $18 Billion for NASA in FY2014

The Senate appropriations subcommittee with jurisdiction over NASA approved $18 billion for the agency for FY2014 this morning, a significant increase over the level recommended by its House counterpart last week and more than the Obama Administration requested.

The Senate Appropriations Commerce-Justice-Science (CJS) subcommittee, chaired by Senator Barbara Mikulski (D-MD), who also chairs the full committee, approved the bill with little discussion in a short markup session.  Full committee markup is scheduled for Thursday at 10:00 am ET.

Little mention was made of NASA during the markup and the press release provides few details.   The subcommittee approved $18 billion for FY2014, an increase above the $17.7 billion requested by the Obama Administration and significantly more than the amount approved by its House counterpart — $16.6 billion (the full House Appropriations Committee will consider its subcommittee’s recommendations tomorrow, but major changes are not expected).

What can be gleaned so far from the Senate subcommittee’s action this morning is that NASA would receive $18 billion.  The press release adds that the funds:

  • will “preserve a NASA portfolio balanced among science, aeronautics, technology and human space flight investments”;
  • includes $373 million more for Science than the House CJS subcommittee’s recommendation; and
  • provides $597 million more [presumably more than the House subcommittee] “to let humans explore beyond low Earth orbit while safely sending our astronauts to the space station on U.S. made vehicles.”

Senator Richard Shelby (R-AL), ranking member of the subcommittee and of the full committee, said during the markup that the bill also includes language to increase transparency in the commercial crew program.  Shelby added that although the bill was developed in a bipartisan manner and he agrees with its priorities, because the total funding level that was allowed under the Senate Budget Resolution is too high in his opinion, he plans to vote against it.  The total amount of funding provided by the bill is $52.3 billion.

Space Policy Events for the Week of July 15-19, 2013 – UPDATE

Space Policy Events for the Week of July 15-19, 2013 – UPDATE

UPDATE:   The Senate Appropriations Committee’s full committee markup of the CJS bill on Thursday has been added.

The following space policy events may be of interest in the week ahead.  The House and Senate are in session this week.

During the Week

The FY2014 Commerce-Justice-Science (CJS) appropriations bill that funds NASA and NOAA will take another step forward in the House this week and begin its trek in the Senate.  On Wednesday, the full House Appropriations Committee will take up the recommendations made by its CJS subcommittee last week, which include a substantial cut to NASA ($16.6 billion instead of the $17.7 billion requested) and a more modest cut to NOAA ($4.9 billion instead of the $5.5 billion requested).   That’s the day in-between when the Senate Appropriations CJS subcommittee (Tuesday) and full committee (Thursday) will markup its version of the bill.  The Senate is expected to be more generous because the Senate Budget Resolution approved higher figures for what the appropriators are allowed to spend versus their House counterparts.   Eventually, of course, the two sides will have to agree.

Meanwhile, 2,000 miles away from Washington, in Denver, the American Astronautical Society will be holding the second International Space Station (ISS) Research and Development conference Tuesday through Thursday.   The conference will highlight the research being conducted aboard the ISS.   Now that the ISS is built and operating, its utility as a space-based laboratory must be demonstrated, especially if the case is to be made to extend operations beyond 2020.  The international partnership has agreed to that many years of operations, but NASA in particular is hoping to extend that to 2028, which will be the 30-year mark for when the first module was launched.  The first morning of the AAS conference — which includes keynotes by ISS Program Manager Mike Suffredini and NASA Associate Administrator for Science John Grunsfeld — will be webcast this year beginning at 10:00 am ET (8:00 am local time in Denver).  See the AAS website for information on how to tune in.

Monday, July 15

Monday-Tuesday, July 15-16

Monday-Wednesday, July 15-17

Monday-Friday, July 15-19

Tuesday, July 16

Tuesday-Wednesday, July 16-17

Tuesday-Thursday, July 16-18

Wednesday, July 17

Thursday, July 18

Friday, July 19

First Antares-Cygnus Trip to ISS Scheduled for September 2013

First Antares-Cygnus Trip to ISS Scheduled for September 2013

NASA and Orbital Sciences Corporation are currently planning the first test launch of Orbital’s Antares rocket and Cygnus spacecraft to the International Space Station (ISS) in September 2013.

The Antares rocket successfully completed its first test in April carrying a mockup of the Cygnus spacecraft.  The September launch will be the first of an actual Cygnus spacecraft, which is designed to take cargo to the ISS.   The rocket and spacecraft are being built as part of NASA’s Commercial Orbital Transportation System (COTS) program.  Unlike Orbital’s COTS competitor, SpaceX, the Cygnus spacecraft is not capable of returning anything to Earth.  SpaceX’s Dragon is the only ISS cargo spacecraft that can return to Earth.  The others — Russia’s Progress, Europe’s ATV, Japan’s HTV and Cygnus– burn up during reentry through Earth’s atmosphere.

The target launch date is September 14 with Cygnus being berthed to the ISS on September 22.  Orbital stresses that the rocket and spacecraft will be ready to go in August, however.   Orbital uses the Mid-Atlantic Regional Spaceport (MARS) at NASA’s Wallops Flight Facility for Antares launches.  Wallops is committed to launching another NASA mission (the Lunar Atmosphere and Dust Experiment Explorer – LADEE) in the September 6-10 time frame, however, so the range is not available in August.  Should the LADEE launch date slip, the Antares-Cygnus mission might occur sooner.

Cygnus will be loaded with 1,550 pounds of cargo for the ISS.  The launch window is open September 14-19.

Rogozin Disputes Stories of Improperly Installed Sensors on Proton

Rogozin Disputes Stories of Improperly Installed Sensors on Proton

Russian Deputy Prime Minister Dmitry Rogozin is disputing stories published in the Russian media that the recent Proton rocket failure was caused by incorrectly installed sensors.

Russia’s Interfax news service reported earlier this week that the rocket’s angular velocity sensors were installed upside down.  Rogozin, who was put in charge of Russia’s space sector in December 2011, is quoted today by Russia’s Itar-Tass news service as calling that theory a “red herring.”  Explaining that the wires are color coded and of different lengths, he said the system is “meant for fools” — presumably meaning that installation is virtually foolproof. 

Russia’s space agency, Roscosmos, has established a commission to investigate the accident.  The Proton rocket crashed to Earth 17 seconds after launch on July 1, 2013 Eastern Daylight Time (July 2 local time at the launch site).  Several videos of the crash are available on YouTube.

NASA IG Makes Case for Commercial Cargo, Crew, CASIS Success

NASA IG Makes Case for Commercial Cargo, Crew, CASIS Success

In a report today, NASA’s Office of Inspector General (OIG) stressed that two factors will determine NASA’s ultimate success in maximizing utilization of the International Space Station (ISS): attracting non-government users and reliable crew and cargo transportation.

Noting that the United States paid $60 billion to build the ISS and currently spends $3 billion a year to operate it, the OIG report concludes that “it is essential that NASA make a concerted effort to maximize the research capabilities” of the space-based laboratory.  

The OIG gives NASA credit for utilization to date, saying that the agency is exceeding its goal of spending an average of 35 hours per week on scientific investigations, is performing over 100 investigations annually, and expects to increase the use of both internal and external research space in FY2013.  The focus of the report is how to increase utilization beyond what has been achieved already.

The Center for the Advancement of Science in Space (CASIS) was created to bring in non-NASA users.  NASA provides $15 million a year and CASIS is expected to bring in additional funds and users.   The OIG report says that NASA and CASIS have not yet established precise metrics that would reveal how successful CASIS has been so far.

A major focus of the report, however, is on the need for reliable crew and cargo transportation to and from the ISS to support research.  It traces the price increases for NASA purchases of “seats” on Russian Soyuz spacecraft from $22 million in 2006, to $25 million in 2010, to $28 million in the first half of 2011, to $43 million in the second half of 2011, to $55.6 million and $60 million for launches in 2014 and 2015, respectively, and $71 million for 2016-2017.   NASA is relying on its commercial crew program to develop U.S. crew space transportation capabilities by 2017, but the OIG report points out that Congress has not provided the agency with the level of funding needed to meet that date. 

Not only is it costly to purchase Russian seats, but relying on Soyuz means only six instead of seven crew members can live and work aboard the ISS, further limiting the amount of research that be conducted, the report continues. 

The OIG did not make any recommendations about commercial crew or cargo, however, only stressing the need for reliable transportation in order to maximize ISS utilization.   Its only recommended action was for NASA to develop metrics to determine CASIS’s success; NASA agreed to do that. 

 

Space Policy Events for the Week of July 8-12, 2013

Space Policy Events for the Week of July 8-12, 2013

The following space policy-related events may be of interest in the week ahead.  The House and Senate both are in session this week.

During the Week

Near Earth Objects (NEOs) — particularly asteroids — are a major topic of debate in Washington space policy circles this week.  From the Secure World Foundation/American Association for the Advancement of Science (SWF/AAAS) panel discussion on Monday, to the day-long Target NEO 2 Workshop on Tuesday, to the markup of the NASA authorization and appropriations bills on Wednesday, to the two-day SBAG meeting on Wednesday and Thursday, what to do about asteroids will be on many minds.   Part of the discussion concerns searching for NEOs either for scientific study or to “find them before they find us” planetary defense scenarios, while another is whether to approve the Obama Administration’s latest human spaceflight goal — ARM (the Asteroid Retrieval Mission or Asteroid Return Mission or Asteroid Redirection Mission).  The FY2014 budget request for NASA includes $105 million to augment NASA’s NEO searches ($20 million in addition to an existing $20 million), develop technology to send a robotic probe to capture an asteroid ($45 million) and nudge it into lunar orbit, and perform studies ($40 million) on how astronauts could use the Orion spacecraft and Space Launch System to visit that asteroid and return a sample.

ARM is a tiny part of NASA’s overall FY2014 budget request of $17.715 billion.   How much the agency will get for FY2014 is expected to be highly controversial in the House authorization and appropriation bill markups by the Space Subcommittee of the House Science, Space and Technology (SS&T) Committee, and the Commerce-Justice-Science (CJS) subcommittee of the House Appropriations Committee, respectively.  The CJS subcommittee also will be marking up NOAA’s FY2014 budget, which is in the same bill as NASA.  The House committees are working under budget numbers in the House Budget Resolution that passed in March that generally protect defense spending by taking larger cuts from non-defense spending, like NASA and NOAA.  The draft House NASA authorization bill would give the agency $16.865 billion for FY2014 and FY2015, a significant cut from the request that would affect many NASA programs.  The draft House bill particularly singles out NASA’s earth science program for cuts.

Meanwhile, another House SS&T subcommittee will markup up the Weather Forecasting Improvement Act on Tuesday.  It is broadly focused on weather forecasting at NOAA, not specifically weather satellites, although it does include language that clarifies what the government can do in terms of commercial data buys and hosted payloads.

Monday, July 8

Tuesday, July 9

Wednesday, July 10

Wednesday-Thursday, July 10-11

Friday, July 12

 

Video Shows Latest Test of SpaceX's Grasshopper Rocket

Video Shows Latest Test of SpaceX's Grasshopper Rocket

New video released yesterday shows another SpaceX test of its Vertical Takeoff Vertical Landing (VTVL) Grasshopper rocket on June 14.  The rocket achieved a new altitude record of 325 meters (1066 feet).

The test, at SpaceX’s Texas facilities, is part of the company’s efforts to develop reusable launch vehicles.  A video posted on YouTube by the company shows the Grasshopper ascending to 325 meters, holding there briefly, and then settling back down on its launch pad.    This test used an additional sensor to enable a more precise landing.

This is the fifth test since September 2012.   The previous altitude record was 80.1 meters (262.8 feet), achieved on March 7, 2013.  Grasshopper is a technology development vehicle using a Falcon 9 rocket first stage tank, a Merlin 1D engine, and four steel and aluminum landing legs.

 

Criminal Proceedings Opened in Proton Crash, Premature Liftoff Possible Cause

Criminal Proceedings Opened in Proton Crash, Premature Liftoff Possible Cause

Russia has opened a criminal proceeding regarding the crash of the Proton-M rocket earlier this week.  Premature liftoff appears to have been the cause. 

Citing an Investigative Committee official, Russia’s ITAR-TASS news agency reports that “Criminal proceedings were initiated over signs of crime envisioned by Article 216, Part of Russia’s penal code/violation of safety rules in mining, construction, or other kinds of work which caused large damages.”  The case will be supervised by the Baikonur prosecutor’s office, which “will also check compliance with the legislation concerning ‘pre-launch preparations and launches of rocket equipment’.”  Baikonur is a city in Kazakhstan that serves the Baikonur Cosmodrome, from which the Proton rocket (and many other Russian rockets) are launched.  Russia leases the Baikonur complex from Kazakhstan.

Russia’s space agency, Roskosmos, established a commission to investigate the failure. The Interfax news agency quotes an unnamed source close the investigation as saying that the rocket lifted off “nearly half a second ahead of time. Hence the engines had not reached the necessary thrust capacity” and an automated emergency system, detecting the problem, directed the rocket away from the pad.  

The Proton-M rocket, carrying three Russian GLONASS navigation satellites, crashed dramatically 17 seconds after liftoff on July 1 Eastern Daylight Time (July 2 local time at the launch site).  It crashed about 2.5 kilometers from the launch pad.   No one was injured.

Russian news sources report that the rocket was insured for about $200 million, but that the satellites were not insured, a loss of $75 million.

This launch was for the Russian government, but many Proton launches are for commercial customers sold through International Launch Services (ILS).  ILS has established its own Failure Review Oversight Board that will review the findings of the Roskosmos commission.    The impact of the failure on the schedule for Proton launches remains unclear.  The next Proton launch, of the SES Astra 2-T satellite, was scheduled for July 20.